OEM Manufacturing

How to Audit a Cookware Factory (Buyer’s Walkthrough)

A 3-hour walkthrough reveals what 3 months of emails can’t. Here is the route.

The walkthrough route

  1. Incoming material: circle storage - interleaved? organised? MTCs on file?
  2. Pressing: die condition, operator skill, in-process checks
  3. Polishing: dust extraction, finish consistency
  4. Assembly: handle fitting jigs, torque control
  5. QC station: dedicated area? gauges calibrated? records kept?
  6. Packing: carton strength, drop-test evidence
  7. Finished goods: FIFO, labelling, dispatch records

Beyond the floor

  • Capacity: current utilisation - a 98%-full factory can’t prioritise you
  • Subcontractors: which processes leave the building?
  • Labour: retention, training, working conditions (your brand’s reputation)
  • Documentation: ask to see a recent QC report and a corrective-action record

Frequently asked questions

How long does a factory audit take?

Half a day for a focused buyer audit; full social-compliance audits take 1-2 days.

Have a cookware project in mind?

We manufacture triply cookware and supply tri-ply circles for OEM, private label and distribution. Tell us your specs - we reply with a quote.